Yellow Line Metro Bangalore – Route, Timings, Fare, Map and Stations
- Introduction: Next Big Bangalore Jump in terms of connectivity.
- The Interchange advantage: Interlinking Bangalore.
- Yellow Line Metro Bangalore Status and estimated completion.
- The Electronic City boost: changing the tech commute.
- Yellow Line at a Glance: Route Data.
- Conclusion: Bangalore: A Smoother, Faster Future.
- Yellow Line Metro Bangalore FAQs
Introduction: Next Big Bangalore Jump in terms of connectivity.
One of the biggest enhancements to the travel of the city is the Yellow Line Metro Bangalore. It will form part of the Namma Metro Phase 2 and improve the connectivity of tech hubs and housing in Bangalore (southern and eastern). It will minimize congestion in traffic by connecting major points and shortening commute time and easing the road. We shall find out what you have to know about the next line.
Yellow Line Metro Route and Big Stations.
The Yellow Line is an entirely elevated line that is approximately 18.82 kilometres long. It links the bustling South Bangalore with the IT corridor, and draws a line between the Bommasandra on the outskirts and the R.V. Road in the south. The line will be aimed at facilitating the traveling around the primary points of employment in the city.
Key Stations in the Yellow Line.
The Yellow Line Metro will have 16 stations which will cater to both the residential and commercial areas. The most notable stops are:
- R.V. Road – a key interchange.
- Jayadeva Hospital - Is Another significant interchange.
- Central Silk Board- a leading intersection and traffic congestion.
- Electronic City- Bangalore's IT center.
- Bommasandra - the end station of the industrial belt.
The Interchange advantage: Interlinking Bangalore.
The other connections with the other metro lines are one of the largest strengths of Yellow Line Metro Bangalore. These middle points allow commuters to easily get in and out of commuting lines, and reach greater destinations.
Key Interchange Stations:
- R.V. Road: links with the running Green Line (North-South direction), allowing the passage between Bommasandra and Nagasandra.
- Jayadeva Hospital: will have access to the proposed Pink Line (Gottigere to Nagawara), which will open the gates to East and Central Bangalore.
- Central Silk Board: will be an intermediate with the Blue Line (K.R. Puram to Silk Board and onward to the Airport).
This web of interconnection of the Yellow Line ensures that it is the backbone of all the Namma Metro system.
Yellow Line Metro Bangalore Status and estimated completion.
Commuters are looking forward to its introduction. There have been various construction stages and some delays in the project, though construction has currently started at a high rate particularly in the areas of critical control and the construction of the stations.
Recent Construction News.
Track laying, station finishing work are being done. Much effort is devoted to the completion of complicated flyovers and road-widening in major crossroads. There is an objective of the BMRCL (Bangalore Metro Rail Corporation Limited) to complete all civil works in the near future.
It is projected that the Yellow Line Metro Bangalore would be through in 2025. The target is hard and the official dates may be changed depending on the testing and safety checks. A gradual opening will be anticipated, where trial services will commence soon before the line is rolled out as a commercial service.
The Electronic City boost: changing the tech commute.
Thousands of people able to work in the Electronic City and other tech parks depend on the Yellow Line. The road to this place is notoriously hard, particularly at times of the day.
Contribution to Commuters of Electronic City.
- Time Saving: It will be an excellent way to save time, traveling between Jayanagar or BTM layout to Electronic City will be much faster; an hour by road will be less than an hour by metro.
- Less Stress: The metro provides a time-dependent schedule where people avoid having the fear of traffic-jams.
- Easier accessibility: The workers of every region within Bangalore will have convenient access to workplaces.
The economy of the city is dependent on the presence of stations around the Electronic City like Infosys Foundation Konappana Agrahara.
Yellow Line at a Glance: Route Data.
This table gives an overview of important facts behind the Yellow Line Metro Bangalore so as to have a quick summary of its size and coverage.
Feature | Detail |
Line Name | Yellow Line (Reach 5) |
Length | approx 18.82 km |
Route | R.V. Road to Bommasandra |
Number of Stations | 16 (All Elevated) |
Exchange rates | R.V. Road (Green), Jayadeva Hospital (Pink), Central Silk Board (Blue) |
Major Areas Served | Jayanagar, BTM, Central Silk Board, Electronic City, Bommasandra |
Expected Completion | 2025 |
Conclusion: Bangalore: A Smoother, Faster Future.
Yellow Line Metro Bangalore is not simply a new piece of metro line as it is a very important infrastructure asset, which will increase life quality of all citizens as well as the effective operations of business. Through connecting the Electronic City with the Green Line and other routes, its benefits are seen in a long-term coverage of the city. Final updates and the precise date of launch are to be awaited. The Yellow Line will introduce the new era of traffic-free and convenient movement - it is time to leave personal transport vehicles and use the new one.
Yellow Line Metro Bangalore FAQs
The Yellow Line Metro connects RV Road to Bommasandra, covering major residential and industrial areas in South Bangalore.
The first train starts around 5:00 AM and the last train runs till 11:00 PM, depending on the route and station.
There are 16 stations on the Yellow Line Metro, offering smooth connectivity across South Bangalore.