Hyderabad Metro

Skip to content

Assembly to Paradise by metro

25min
₹47fare
9stops
1change

10.5 km

First train 06:09 · last 23:02 (Monday to Friday)

Ride 9 stops
  1. Assembly
  2. Lakdi-ka-pul
  3. Khairatabad
  4. Irrum Manzil
  5. Punjagutta
  6. Ameerpet
  7. Begumpet
  8. Prakash Nagar
  9. Rasoolpura
  10. Paradise
Return tripParadise to Assembly

Source: Hyderabad Metro Rail, checked on 11 Nov 2026. Contains data provided by Hyderabad Metro Rail Ltd.

Not run or endorsed by HMRL. Report a mistake

Assembly to Paradise by metro

Red Line then Blue Line 1 change, at Ameerpet.

₹47Fare, one way
25 minTypical time
9Stops
1Change
10.5 kmAlong the track

How to go

  1. At Assembly, take the Red Line towards Miyapur. Platform 2. Ride 5 stops, about 10 min, 5.3 km. Get off at Ameerpet.
  2. Change at Ameerpet to the Blue Line. Allow about 4 minutes to walk between platforms. This is our allowance; the operator gives no figure.
  3. At Ameerpet, take the Blue Line towards Nagole. Platform 4. Ride 4 stops, about 9 min, 5.2 km. Get off at Paradise.

Typical time is 25 minutes: about 19 on trains and about 6 for the change, including the wait for the next train.

Another way: Red Line, then Green Line, then Blue Line, changing at MG Bus Station and JBS Parade Ground, about 42 min.

Stations on this trip

  1. Assembly Start
  2. Lakdi-ka-pul
  3. Khairatabad
  4. Irrum Manzil
  5. Punjagutta
  6. Ameerpet Change here
  7. Begumpet
  8. Prakash Nagar
  9. Rasoolpura
  10. Paradise End

First and last train

Departures from Assembly for this trip.

DayFirst trainLast train
Monday to Friday06:0923:02
Saturday06:0923:04
Sunday06:0023:03

Monday to Friday: the first train reaches Paradise at 06:37 and the last at 23:29. The last time shown still makes the connection.

Fare

₹47 one way for one adult. This is fare zone 5 of 10 on the operator's fare chart, in force since 24 May 2025. The same fare applies in the other direction. One ticket covers the whole trip.

More

Source: Hyderabad Metro Rail, checked on 11 Nov 2026. Contains data provided by Hyderabad Metro Rail Ltd.

Not run or endorsed by HMRL. Report a mistake