Nagpur Metro

Skip to content

LAD Square to Gaddigodam Square by metro

25min
₹15fare
7stops
1change

First train 06:19 · last 21:52 (Every day)

Ride 7 stops
  1. LAD Square
  2. Shankar Nagar Square
  3. Institution Of Engineers
  4. Jhansi Rani Square
  5. Sitabuldi
  6. Zero Mile Freedom Park
  7. Kasturchand Park
  8. Gaddigodam Square
Return tripGaddigodam Square to LAD Square

Source: Nagpur Metro, checked on 11 Nov 2026.

Not run or endorsed by Maha Metro. Report a mistake

LAD Square to Gaddigodam Square by metro

Aqua Line then Orange Line 1 change, at Sitabuldi.

₹15Fare, one way
25 minTypical time
7Stops
1Change

How to go

  1. At LAD Square, take the Aqua Line towards Prajapati Nagar. Ride 4 stops, about 7 min. Get off at Sitabuldi.
  2. Change at Sitabuldi to the Orange Line. Allow about 4 minutes to walk between platforms. This is our allowance; the operator gives no figure.
  3. At Sitabuldi, take the Orange Line towards Automotive Square. Ride 3 stops, about 5 min. Get off at Gaddigodam Square.

Typical time is 25 minutes: about 12 on trains and about 13 for the change, including the wait for the next train.

Stations on this trip

  1. LAD Square Start
  2. Shankar Nagar Square
  3. Institution Of Engineers
  4. Jhansi Rani Square
  5. Sitabuldi Change here
  6. Zero Mile Freedom Park
  7. Kasturchand Park
  8. Gaddigodam Square End

First and last train

Departures from LAD Square for this trip.

DayFirst trainLast train
Every day06:1921:52

The first train reaches Gaddigodam Square at 06:40 and the last at 22:28. The last time shown still makes the connection.

Fare

₹15 one way for one adult. This is the figure for this pair in the operator's fare table. The same fare applies in the other direction. One ticket covers the whole trip.

Maha Card: 10% off. Maha Card for students: 30% off. Students up to graduation only. The operator does not say how the discounted fare is rounded, so no rupee figure is shown.

Sunday and national holiday special fare: the operator says it applies but does not publish the amount, so the fare on those days may differ.

The operator states no fare order date and no date of last revision. The matrix PDF was created on 2 Sep 2026 and is the chart on the site on 11 Nov 2026.

More

Source: Nagpur Metro, checked on 11 Nov 2026.

Not run or endorsed by Maha Metro. Report a mistake