Line 2B Phase 1: Chembur to Maharashtra Nagar-Mandale
Also called Yellow Line and Chembur to Mandale. Run by Maha Mumbai Metro (Lines 2A, 7, 9, 2B).
Stations in order
- 1. Chembur
- 2. Deshbhakt N.G. Acharya Udyan - Diamond Garden, Chembur
- 3. Ch. Shivaji Maharaj Chowk (Chembur)
- 4. Deonar
- 5. Mankhurd
- 6. Maharashtra Nagar-Mandale
First and last train
| From | Day | First train | Last train |
|---|---|---|---|
| Chembur towards Maharashtra Nagar-Mandale | Every day | 06:00 | 22:30 |
| Maharashtra Nagar-Mandale towards Chembur | Every day | 06:00 | 22:15 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
How often trains run
About every 9 minutes 30 seconds. 209 trips (press note of 6 Apr 2026).
Line 2B Phase 1 is not joined by rail to the rest of the network: it stands alone between Chembur and Mandale. The rest of Line 2B (to DN Nagar) is not open.
Fare: use the operator's fare tool
MMMOCL does not publish the fare for each pair of stations. Check the fare on the operator's fare tool: mmmocl.co.in/fare_table
More
Source: Mumbai Metro One (Line 1); Maha Mumbai Metro (Lines 2A, 7, 9, 2B); Mumbai Metro Line 3 Aqua Line (MMRC), checked on 12 Nov 2026. Positions of Lines 2A, 7, 9 and 2B stations are from OpenStreetMap contributors (ODbL). Positions of Line 1 stations are from Wikidata (CC0). Positions of Line 3 stations are MMRC's own.
Not run or endorsed by Metro One, MMMOCL and MMRC. Report a mistake