Mumbai Metro

Skip to content

Mumbai Metro timings

First and last trains where the operator publishes them.

Line 1

FromDayFirst trainLast train
Versova towards GhatkoparMonday to Friday05:3023:25
Ghatkopar towards VersovaMonday to Friday05:3023:50

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

Weekdays (Monday to Friday): 3.5 minutes in peak hours, gradually up to 7 minutes in non-peak hours. Saturdays, Sundays and public holidays: a different schedule depending on commuter footfall (not published).

Line 2A

FromDayFirst trainLast train
Dahisar (East) towards Andheri WestEvery day06:0022:35
Andheri West towards Dahisar (East)Every day05:5523:00

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

Peak hours 6 minutes; non-peak 8 to 10 minutes. 289 trips on weekdays, 231 on Saturdays, 213 on Sundays (press note of 6 Apr 2026).

Line 7

FromDayFirst trainLast train
Gundavali towards Dahisar (East)Every day06:0023:00
Dahisar (East) towards GundavaliEvery day05:5822:38

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

Peak hours 5 minutes 50 seconds; non-peak 8 to 10 minutes. 276 trips on weekdays, 223 on Saturdays, 205 on Sundays for the joined Line 7 and 9 corridor (press note of 6 Apr 2026).

Line 7 and Line 9 run as one corridor, 19.79 km from Gundavali to Kashigaon. Most trains run through Dahisar (East) without a change.

Line 9 Phase 1

FromDayFirst trainLast train
Dahisar (East) towards KashigaonEvery day06:3323:33
Kashigaon towards Dahisar (East)Every day05:5022:30

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

As Line 7: the two lines run as one corridor.

Line 7 trains run on to Kashigaon without a change.

Line 2B Phase 1

FromDayFirst trainLast train
Chembur towards Maharashtra Nagar-MandaleEvery day06:0022:30
Maharashtra Nagar-Mandale towards ChemburEvery day06:0022:15

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

About every 9 minutes 30 seconds. 209 trips (press note of 6 Apr 2026).

Line 3

FromDayFirst trainLast train
Aarey JVLR towards Cuffe ParadeEvery day05:5522:30
Cuffe Parade towards Aarey JVLREvery day05:5522:30

End-station times only.

If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.

Peak headway 4 minutes 25 seconds on weekdays and 337 weekday trips from 2 Nov 2026 (MMRC press note of 3 Nov 2026). The site text and booklet give older figures (5 minutes 55 seconds).

Operator timetables

Times can change on holidays and special days. Check the operator's notices before a late or early trip.

Mumbai Metro stations and lines

Source: Mumbai Metro One (Line 1); Maha Mumbai Metro (Lines 2A, 7, 9, 2B); Mumbai Metro Line 3 Aqua Line (MMRC), checked on 12 Nov 2026. Positions of Lines 2A, 7, 9 and 2B stations are from OpenStreetMap contributors (ODbL). Positions of Line 1 stations are from Wikidata (CC0). Positions of Line 3 stations are MMRC's own.

Not run or endorsed by Metro One, MMMOCL and MMRC. Report a mistake