Mumbai Metro timings
First and last trains where the operator publishes them.
Line 1
| From | Day | First train | Last train |
|---|---|---|---|
| Versova towards Ghatkopar | Monday to Friday | 05:30 | 23:25 |
| Ghatkopar towards Versova | Monday to Friday | 05:30 | 23:50 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
Weekdays (Monday to Friday): 3.5 minutes in peak hours, gradually up to 7 minutes in non-peak hours. Saturdays, Sundays and public holidays: a different schedule depending on commuter footfall (not published).
Line 2A
| From | Day | First train | Last train |
|---|---|---|---|
| Dahisar (East) towards Andheri West | Every day | 06:00 | 22:35 |
| Andheri West towards Dahisar (East) | Every day | 05:55 | 23:00 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
Peak hours 6 minutes; non-peak 8 to 10 minutes. 289 trips on weekdays, 231 on Saturdays, 213 on Sundays (press note of 6 Apr 2026).
Line 7
| From | Day | First train | Last train |
|---|---|---|---|
| Gundavali towards Dahisar (East) | Every day | 06:00 | 23:00 |
| Dahisar (East) towards Gundavali | Every day | 05:58 | 22:38 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
Peak hours 5 minutes 50 seconds; non-peak 8 to 10 minutes. 276 trips on weekdays, 223 on Saturdays, 205 on Sundays for the joined Line 7 and 9 corridor (press note of 6 Apr 2026).
Line 7 and Line 9 run as one corridor, 19.79 km from Gundavali to Kashigaon. Most trains run through Dahisar (East) without a change.
Line 9 Phase 1
| From | Day | First train | Last train |
|---|---|---|---|
| Dahisar (East) towards Kashigaon | Every day | 06:33 | 23:33 |
| Kashigaon towards Dahisar (East) | Every day | 05:50 | 22:30 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
As Line 7: the two lines run as one corridor.
Line 7 trains run on to Kashigaon without a change.
Line 2B Phase 1
| From | Day | First train | Last train |
|---|---|---|---|
| Chembur towards Maharashtra Nagar-Mandale | Every day | 06:00 | 22:30 |
| Maharashtra Nagar-Mandale towards Chembur | Every day | 06:00 | 22:15 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
About every 9 minutes 30 seconds. 209 trips (press note of 6 Apr 2026).
Line 3
| From | Day | First train | Last train |
|---|---|---|---|
| Aarey JVLR towards Cuffe Parade | Every day | 05:55 | 22:30 |
| Cuffe Parade towards Aarey JVLR | Every day | 05:55 | 22:30 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
Peak headway 4 minutes 25 seconds on weekdays and 337 weekday trips from 2 Nov 2026 (MMRC press note of 3 Nov 2026). The site text and booklet give older figures (5 minutes 55 seconds).
Operator timetables
- Metro One: Train timetable of the operator
- MMMOCL: Train timetable of the operator
Times can change on holidays and special days. Check the operator's notices before a late or early trip.
Mumbai Metro stations and lines
Source: Mumbai Metro One (Line 1); Maha Mumbai Metro (Lines 2A, 7, 9, 2B); Mumbai Metro Line 3 Aqua Line (MMRC), checked on 12 Nov 2026. Positions of Lines 2A, 7, 9 and 2B stations are from OpenStreetMap contributors (ODbL). Positions of Line 1 stations are from Wikidata (CC0). Positions of Line 3 stations are MMRC's own.
Not run or endorsed by Metro One, MMMOCL and MMRC. Report a mistake