Line 9 Phase 1: Dahisar (East) to Kashigaon
Also called Red Line and Dahisar East to Kashigaon. Run by Maha Mumbai Metro (Lines 2A, 7, 9, 2B).
Stations in order
- 1. Dahisar (East) Change for Line 2A and Line 7
- 2. Pandurangwadi
- 3. Miragaon
- 4. Kashigaon
First and last train
| From | Day | First train | Last train |
|---|---|---|---|
| Dahisar (East) towards Kashigaon | Every day | 06:33 | 23:33 |
| Kashigaon towards Dahisar (East) | Every day | 05:50 | 22:30 |
End-station times only.
If a day is not listed, we do not have the operator's times for it. That does not mean there are no trains. Check the operator's timetable.
How often trains run
As Line 7: the two lines run as one corridor.
Line 7 trains run on to Kashigaon without a change.
Fare: use the operator's fare tool
MMMOCL does not publish the fare for each pair of stations. Check the fare on the operator's fare tool: mmmocl.co.in/fare_table
More
Source: Mumbai Metro One (Line 1); Maha Mumbai Metro (Lines 2A, 7, 9, 2B); Mumbai Metro Line 3 Aqua Line (MMRC), checked on 12 Nov 2026. Positions of Lines 2A, 7, 9 and 2B stations are from OpenStreetMap contributors (ODbL). Positions of Line 1 stations are from Wikidata (CC0). Positions of Line 3 stations are MMRC's own.
Not run or endorsed by Metro One, MMMOCL and MMRC. Report a mistake